The Game

How RenoRise plays.

From spotting a rundown lot to cashing out on the finished flip — here's the full loop: buying, evaluating, planning, remodeling, staffing your crew, and selling for profit.

01 · Acquisition

Buy properties across the city

Every district has its own mix of listings, from waterfront row-houses to gutted industrial shells. Buying is where a flip starts — and where a bad read on a lot can sink one before it begins.

  • Browse listings across every district, filtered by budget, lot size, and renovation potential.
  • Distressed and foreclosure sales appear on a rotating basis — the worse the condition, the deeper the discount.
  • Zoning and lot data are visible before you buy, so you know what you're allowed to build.
4:3 property listing screen placeholder

02 · Assessment

Evaluate before you commit

An inspection surfaces what a listing photo won't. Run an evaluation before you buy — or before you plan a remodel — to see what you're actually working with.

Condition report

Structural wear, water damage, and code violations, surfaced before you sign anything.

Location score

Walkability, neighborhood trend, and nearby amenities, rolled into a single rating.

Market comps

Recent sale prices for similar renovated units nearby, so you know your ceiling.

Renovation potential

An estimated post-renovation value ceiling based on layout, lot size, and zoning.

03 · Planning

Plan the renovation before swinging a hammer

Every job starts on paper. Lay out the plan against the property's existing blueprint, sequence the work, and set a budget before any crew shows up.

  • Sketch changes directly on the existing floor plan and see the impact on livable space instantly.
  • Sequence work so structural and plumbing changes happen before finishes go in.
  • Set a budget ceiling — the plan flags any line item that would blow past it.
4:3 blueprint planning screen placeholder

04 · Scope

Choose your remodel tier

Not every property needs to be gutted. Pick the scope that matches the property's condition, your budget, and how fast you need to sell.

Cosmetic scope

Basic Remodel

A cosmetic refresh for properties that are already structurally sound — fast, cheap, and enough to move a listing.

  • Paint, flooring, fixtures, and surface repairs
  • Lower cost and faster turnaround
  • No structural or floor-plan changes
  • Best for properties with a solid condition report

05 · Layout

Reshape the floor plan

Full Remodels unlock the layout editor. Redraw the interior, and the property's livable square footage and value update on the spot.

  • Knock down interior walls to open up living space.
  • Reroute plumbing and electrical to support a new layout.
  • Add, split, or remove rooms — subject to structural and zoning limits.
4:3 floor-plan editor placeholder

06 · Crew

Hire the crew that gets it done

A renovation plan is only as good as the crew executing it. Build a roster and assign the right specialist to the right job.

General contractor

Runs the site, coordinates every other trade, and sets the overall pace of the job.

Electrician

Handles rewiring and panel upgrades — required for any full electrical overhaul.

Plumber

Reroutes supply and drain lines, especially when a floor plan moves a bathroom or kitchen.

Interior designer

Picks finishes and staging that move the needle on the final sale price.

07 · Output

Keep your crew productive

Hiring the crew is only half the job — how you manage them determines how fast a renovation actually finishes.

  • Crew skill level and morale set your base productivity rate.
  • Overlapping too many jobs on one site slows everyone down.
  • Tool and training upgrades push productivity past its starting cap.
4:3 crew productivity dashboard placeholder

08 · Budget

Costs and timelines you can plan around

Every remodel tier has a predictable cost and time range, so you can budget a flip before the first hammer swings. Actual figures shift with district, crew skill, and property size.

3–7 days Basic remodel

Typical in-game turnaround for a cosmetic refresh.

10–21 days Full remodel

Structural work and floor-plan changes take longer to sign off.

+25–50% Rush fees

Pay a premium to compress any job's timeline.

Variable Change orders

Mid-project plan changes add both cost and days to the job.

09 · Payoff

Sell for profit

The whole loop closes here. List the finished property, watch the market, and decide whether to cash out or hold.

  • List the property once renovations are signed off by an inspector.
  • Market conditions and neighborhood comps shift the achievable sale price day to day.
  • Reinvest profits into your next flip — or hold and rent the unit for passive income.
4:3 sale listing screen placeholder